Protecting Patio & Block Paving

Protect Patio and Paving Step 1)

Step 1

Newly laid patios should be left for one month before applying a seal
Clean down the surface with a stiff bristle brush, removing any dust or dirt.

Protect Patio and Paving Step 2)

Step 2

Clean any mould or algae with Advance Patio & Block Paving Cleaner. Or use Oil & Drive Cleaner to clean stubborn oil or fuel stains.

Ensure all cleaners are thoroughly dry before applying the seal.

Protect Patio and Paving Step 3)

Step 3

Apply on a dry day above 10˚C in long smooth strokes

When applying to textured block paving, make sure any puddles are spread into dry areas.

Wait 4 hours before applying a second coat.

The patio and block paving can be used 24 hours after applying the second coat.